Posted: March 11th, 2023
Part 1You have been assigned as a project manager for a small construction company and have been assigned your first project. The client feels they have a basic grasp on their requirements but also feels that they will know more as the project progresses. Using your knowledge of life cycle models, identify two models that may work based on your knowledge of the project. The scope of the project is as follows:
Using your experience documenting scope, outline the problem/opportunity statement you are trying to solve for, 2-3 success criteria, and any assumptions, risks, or obstacles. Part 2Create a Work Breakdown Structure (WBS) for the following scope:
Requirement 1: 3 bedrooms
Requirement 2: 2.5 bathrooms
Requirement 3: Pool
Requirement 4: 2 patios, one patio should be enclosed
Your WBS should be based upon your chosen Life Cycle Methodology and include any deliverables. Assignment Requirements:
Place an order in 3 easy steps. Takes less than 5 mins.